Thursday, June 12, 2008
Concrete Pouring Day
June 12th. We passed our inspection yesterday. It was our first on-site inspection and I was nervous as a cat on a hot tin roof...worried that the pool would be a problem, the fireplaces would be a problem, the set-back would be measured and that he would notice the casita. After I worried over that list, I had a secondary back-up list to worry about, just in case I ran out of anxiety.
The only item the inspector requested was one more piece of rebar in a trench. If he's on the job to the end, we're on easy street at last.
Last night three cars full of people came to look over the concrete job and brought up a pump. The truck will sit in front of the house and the pump will push the concrete into the forms. It's a family of people doing the work. Chevo is still messing around in the trenchs doing little things. The plumber was here at 8:10 all alone, but he complete what was necessary.
DixieLine is providing the lumber and we had a bit of a conflict between Ken's lumber guy at Dixie and Mike Kerr who usually does business with UBuildIt. There seems to be little cooperation between people as they work on commission.
Richard is at Costco with Dion buying the little storage shed..Dione will assemble it today as well and we can move everything in. No Jaime today.