Tuesday, June 03, 2008
Week two of demolition
Monday and the crews were to be on hand at 8:30 - framer, demo guys to mark the spots for the saw cuts into the concrete. At 9:15 the framer showed and the demo guys rolled in around 12:00, saying they'd had a flat tire with the big rig. They brought the bob cat with attachments and the saws, 2 guys and Angel the bobcat operator. They got straight to work breaking up the remaining concrete on the back patio, former patio and broke one of the main pipes in the process. We didn't know it was built into the concrete. A major flood ensued filling up the patio space where the new kitchen is to be located. Now everything is muddy and a mess. The whole place is littered from end to end and it seems we have the two worst workers Dirt Cheap Demo has on the staff. The bobcat operator gets things done but the others are just foot draggers. On top of this. they can't operate the concrete saw without water so they have been filling pop bottles all day to cool the device.
Progress Monday and Tuesday: All areas marked for saw cuts. All large areas of concrete are chopped up. Today we dumped one load by our stream and one load on Gails property. Gail came over to hook up the electrical to the garage but I told him it wasn't necessary. The two bozos knocked down the one wall remaining on the garage side.
I left at 2:30 leaving Richard still looking for a solution for the water problem and got a hair cut in Temecula. It was such a relief to be away from the chaos.
We did meet with a young, energetic and articulate landscape designer today with whom we were very impressed. His name is Gio Leonardo, how artistic is that.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment