The second story is going on the house. Stairs are being crafted and the turret is under construction. Temperatures reaching almost 100 degrees in the afternoon are not slowing anything down. The "faces are down" and the hammers keep pounding.


Yesterday there was a big crew on the scene. 6 trucks were parked in the driveway alongside a new delivery of wood from DixieLine. The floor joists were being hoisted when we arrived about 8:00.


"Saving the beehive" is our latest challenge. We require a 2" clearance between the back of the fireplace and the framing. Even though Nick and Fran's old plan shows a two inch clearance on the blueprint, there is only a one inch clearance in reality. After considering several possibilities...shaving off a inch from the back, adding on several courses so the fireplace sticks out...we decided on Ken's solution which is to attach some rebar and fold it out and around to support an extra inch or so, re-framing it. We've had a couple of masons up to look at the thing and opine on what to do and are waiting for bids.


Heating/ac and roofing are our next trades.


No comments:

Post a Comment