Saturday, August 16, 2008

Saturday and getting a slow start. Thursday and Friday the heating and air conditioning people came and did a lot of engineering. The metallic arms are crawling all over the house and look like a MRI of the house guts. The ducts take up more space than they should and we are having to give up some storage space to accomodate them. Meanwhile the framers continue to slog along trying to repair the miscalculation on the upstairs trusses. I've taken everything to the architect and am waiting to hear back from them.

Also pressing is the selection of stone (I'm having an awful time), electrical matters - Richard has very strong ideas about lighting, and finally finishing up the Bali things. I may make a last ditch effort at the stair railing...the risk is about $1200. Buying the railing here and installing it will be over $5,000.00 which is ridiculous for 8 stairs.

The plumber should be starting next week and the fireplace extension will be installed. The only thing preventing the mason from getting in and doing the fireplace is my stone selection. The other thing pressing is selection of someone to install the exterior doors.

Meanwhile the stream is coming along. Oscar feels the prep will be completed this weekend and they will concrete it all in next weekend. I've asked for a price on Elbow digging out the front courtyard and building the short wall at the front.

No comments:

Post a Comment